10 Ionia Residence Inn
PTAC Engineering
Location:
The Hinman Company
Grand Rapid, MI
Schedule:
Precast Erection Start Date: 06/2019
Precast Erection Completion Date: 01/2020
Cost:
Total Project Cost: $ 30 million
Square Footage: 131, 201 SF
Involved Companies
Precast Concrete Producer
Kerkstra Precast
3373 Busch Drive
Grandville, MI 49418
Architect
Yamasaki Architecture
3011 West Grand Blvd.
Detroit, MI 48202
Precast Concrete Specialty Engineer
PTAC Engineering
21 S Tarragona Street
Pensacola, FL 32502
General Contractor
Wolverine Building Group
4045 Barden Dr.
Grand Rapids, MI 49512
Background
Precast allowed for efficient vertical construction for a building with highly complex geometry including tight radiused edges. This project challenged and successfully overcame precast structural engineering opportunities. The building’s precast wall system helped eliminate vertical elements in occupied spaces. The producer and design team combined the use of BIM Coordination and 3D modeling to deal with ever changing project details. Precast wall panels featured pre-glazed fenestrations which eliminated jobsite window installations, which assisted in fast-tracking exercises and dried the project in quicker. The project featured a Hybrid Framing system including precast hollow-core floor slabs and load-bearing wall panels.