Route 49 Dual Bridges
F-S Prestress

 
RT 49 Bridges.png
 
 

Location:
Route 49
Forrest County, MS

Schedule:
Project Completion Date: 2018

Cost:
Square Footage: 150" feet (combined)
Cost of Project: $8.5 million (combined)

Companies Involved

Precast Concrete Producer

F-S Prestress
25 Peps Point Road
Hattiesburg, MS 39404
www.fsprestress.com

General Contractor

Tanner Construction
102 Ellisville Blvd
Laurel, MS
http://www.tannerconstruction.net/

 

Background

As part of a $8.5 million project along Route 49 which included five bridge replacements, F-S Prestress provided precast components for two bridges between Brooklyn, MS and Camp Shelby, MS. The first bridge has three spans. Each span has 5 ASSHTO Type II+2 girders, approximately 50’ long. A second bridge has five spans comprised of two spans of 40’ Type I+II, two spans of 60’ Type III, and one span of 90’ Type IV girders.